Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/72067
Export to Endnote
Title: Final report for the Glyde River Project McArthur Basin Els 8643, 9323, 9502 and 9508
Title Holder / Company: BHP Minerals
Report id: CR1998-0315
Tenure: EL8643;  EL9323;  EL9502;  EL9508
Year: 1998
Author: Stephens, DI
Abstract: The tenements have been covered by an airborne Geochem survey, which delineated some conductors. The Boom 1 conductor was tested by a ground EM survey (boundary EL9508/8643) which suggested a 3 ohm.m conductor to exist at 230m. The conductor was tested by a 254m diamond core hole, which intersected structurally controlled minor chalcopyrite and traces of galena and sphalerite, 20m @ 0.12% Cu was intersected in the hole within the Wollogorang Formation. This suggested that the Wollogorang Formation is generally enriched in Cu, hence the intersection of chalcopyrite is not considered significant.
20m @ 0.1% Cu
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19980315.pdf369.01 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader