Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/72067
Export to Endnote
Title: | Final report for the Glyde River Project McArthur Basin Els 8643, 9323, 9502 and 9508 |
Title Holder / Company: | BHP Minerals |
Report id: | CR1998-0315 |
Tenure: | EL8643; EL9323; EL9502; EL9508 |
Year: | 1998 |
Author: | Stephens, DI |
Abstract: | The tenements have been covered by an airborne Geochem survey, which delineated some conductors. The Boom 1 conductor was tested by a ground EM survey (boundary EL9508/8643) which suggested a 3 ohm.m conductor to exist at 230m. The conductor was tested by a 254m diamond core hole, which intersected structurally controlled minor chalcopyrite and traces of galena and sphalerite, 20m @ 0.12% Cu was intersected in the hole within the Wollogorang Formation. This suggested that the Wollogorang Formation is generally enriched in Cu, hence the intersection of chalcopyrite is not considered significant. 20m @ 0.1% Cu |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19980315.pdf | 369.01 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.