Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/70697
Export to Endnote
Title: | 1979 Annual report, McArthur River, Glyde River Projects, ELs 1330, 1331, 1332, 1333, 1375, 1803 and 1943 |
Title Holder / Company: | Amoco Minerals Australia Company |
Report id: | CR1980-0064 |
Tenure: | EL1330; EL1331; EL1332; EL1333; EL1375; EL1803; EL1943 |
Year: | 1980 |
Author: | Wilkins, NA |
Abstract: | No significant mineralisation was found in diamond drillholes MANT-79-2at Caranbirini, which was drilled from the PMR14 precollar, to a depth of 617m.The structure and stratigraphy of the M12 basin is identical to the basin containing the HYC mineralisation. However, there is a lack of thick massive sulphides, an absence of thin cherty wisps and nodules, and a predominance of non-vitric tuffaceous material over vitric tuffs. These absences are interpreted as a lack of exhalative activity in the M12 basin. Gravity surveys still seen as best indicator of determining basins of interest. No significant results encountered in the drill holes, some high zinc values. Kennecott will farm-in, and fund further exploration. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19800064.pdf | 11.49 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.