Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/69883
Export to Endnote
Title: Second and Final Report for Southern Tanami Project EL 8738, EL8739, EL 8740, EL 8755, EL 8756, EL 8757, EL 8758, EL 9157, EL 9268, EL 9270, EL 9615, EL 9831 and EL 9846
Title Holder / Company: Anglogold Australia
Report id: CR2003-0089
Tenure: EL8738;  EL8739;  EL8740;  EL8755;  EL8756;  EL8757;  EL8758;  EL9157;  EL9268;  EL9270;  EL9615;  EL9831;  EL9846
Year: 2002
Author: Spurway, C
Abstract: This report summarises the work completed within the two years of tenure. The work included data compilation, aerial photography, detailed aeromagnetic/radiometric survey, geophysical processing and modelling, regolith mapping and posthole RAB and Aircore drilling. Results from sampling were disappointing with a maximum Au result of 6 ppb returned from a 3 m composite in transported gravel horizon. No coherent residual or transported Au or As anomalies were derived from the posthole geochemical drilling. The company review the prospectivity of the area and recommended for the licences within the project area to be relinquished.
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR2003089_2003_GS.pdf88.39 MBPDF Add
CR2003-0089_Appendix1.zip20.65 kBZIP Add
CR2003-0089_Geophysics.zip28.49 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader