Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/69630
Export to Endnote
Title: | Third Annual Report for the Mt Frederick Project for the calendar year 2001 |
Title Holder / Company: | Normandy NFM |
Report id: | CR2002-0036 |
Tenure: | EL8301; EL8796; EL8797; EL8976; EL8977; EL8804; EL9015; EL8899 |
Year: | 2001 |
Author: | Power, DM |
Abstract: | Work included gridding, sampling and drilling programs. A total of 24.6 line km of gridding has been established within EL 8301 Alpha to assist with the drilling program. Verification soil sampling program was conducted within EL 8804 and results are not available yet. A regional surface geochemical program was completed within EL 8899. Assays not returned yet. Verification sampling within EL 9015 failed to return results of similar magnitude to those reported last year. Contamination of original sample material suspected. Drilling was only completed within EL 8301 and all samples returned assays less than 200ppb Au. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR20020036_2002_GA.pdf | 882.14 kB | Add | |
CR2002-0036_Appendix1.zip | 111.9 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.