Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/69455
Export to Endnote
Title: Report for the Arthur Hills Project covering the 2000 field season
Title Holder / Company: Normandy NFM
Report id: CR2001-0083
Tenure: EL8473;  EL9560;  EL9561
Year: 2001
Author: Harrison, S
Abstract: Exploration work included reconnaissance sampling programs, ground magnetic surveys and aircore drilling. Results from infill lag sampling at Silver Fox revealed numerous (69) elevated (>0.7 ppb) Au values, with peak values in the range of 2.2-11.3 ppb. These defined a coherent anomaly, which is coincident with peaks from the initial lag sampling. Arsenic results were more subtle, with 8 samples being elevated (>57 ppm), the 4 peak values (103 -239 ppm) not being coincident with the Au anomaly. Anomalous results were received from sampling at Silver Fox, where a mineralised quartz vein returned 10.5 ppb Au. Rock chips elsewhere on the lease were not anomalous, with a peak value of 2 ppb near the southern margin of EL 9561. All results from drilling returned gold values below detection limit, within a maximum of 110 ppm arsenic and 3 ppm bismuth. Based on exploration results EL 8473 was surrendered and portions of EL 9560 and EL 9561 selected for relinquishment.
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR20010083_2001_GA.pdf2.32 MBPDF Add
CR2001-0083_Appendix1.zip80.28 kBZIP Add
CR2001-0083_Appendix4.zip207.78 kBZIP Add
CR2001-0083_Appendix_2.zip789.92 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader