Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/69205
Export to Endnote
Title: | Final report for EL 8211 Litchfield Project, covering the period 26 October 1993 to 25 October 1999 |
Title Holder / Company: | Paladin Resources |
Report id: | CR2000-0030 |
Tenure: | EL8211 |
Year: | 1999 |
Author: | Hogarth, PJ |
Abstract: | This report summarises exploration activities undertaken during the licence life. The work included geological mapping, sampling, ground magnetic survey, trenching and RC drilling. Encouraging gold values observed in surface sampling were not confirmed in reverse circulation drilling. Best results were 0.61 g/t over 3m (CCRC-02), 0.37 g/t over 6m (CCRC-03) and 0.35 g/t over 3m (CCRC-04). No targets were identified for further exploration. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR20000030.pdf | 910.91 kB | Add | |
EL8211_1999_MAG.xls | 97 kB | Microsoft Excel | Add |
CR2000-0030_Data.zip | 91.57 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.