Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/69062
Export to Endnote
Title: | Final report EL 8086, for the period 28-04-1993 to 29-08-1994 Tennant Creek, NT, Southern Star prospect |
Title Holder / Company: | Poseidon Gold |
Report id: | CR1994-0856 |
Tenure: | EL8086; SEL8748 |
Year: | 1994 |
Author: | Mujdrica, S |
Abstract: | During the period of the licence available airborne magnetics was acquired and interpreted plus photogeology mapping was completed. An initial vacuum drill program was completed consisting of 82 vacuum drill holes (353m). This survey outlined two areas of interest. Follow up of these areas consisted of 60 vacuum drill holes (315m). The results from which were disappointing. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19940856.pdf | 1.55 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.