Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/68892Export to Endnote
| Title: | Annual report presented for MCC 809 (The Extension) for the 12 month period to 17th August 1993. |
| Title Holder / Company: | Tennant Creek Operations North Flinders Mines |
| Report id: | CR1994-0377 |
| Tenure: | MCC809 |
| Year: | 1994 |
| Author: | Archibald, DAC |
| Abstract: | Work completed during the year ending 17-08-1993 included 5 RAB holes totalling 303m and 7 RC holes totalling 796m. From the RAB drilling a best intercept of 15m at 5.24g-t Au including 3m at 22g-t Au was obtained. Gold mineralization is associated with a shear zone. RC follow up encountered water flow which created concerns re-sample integrity. The drilling has illustrated a continuity of gold mineralization over a narrow strike. |
| Date Added: | 23-Oct-2013 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| CR19940377.pdf | 3.29 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.