Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/68892
Export to Endnote
Title: Annual report presented for MCC 809 (The Extension) for the 12 month period to 17th August 1993.
Title Holder / Company: Tennant Creek Operations
North Flinders Mines
Report id: CR1994-0377
Tenure: MCC809
Year: 1994
Author: Archibald, DAC
Abstract: Work completed during the year ending 17-08-1993 included 5 RAB holes totalling 303m and 7 RC holes totalling 796m. From the RAB drilling a best intercept of 15m at 5.24g-t Au including 3m at 22g-t Au was obtained. Gold mineralization is associated with a shear zone. RC follow up encountered water flow which created concerns re-sample integrity. The drilling has illustrated a continuity of gold mineralization over a narrow strike.
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19940377.pdf3.29 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader