Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/68870
Export to Endnote
Title: | Combined annual report MCCs 1032, 1033, 1038 and 1039 16 November 1991 to 15 November 1992. |
Title Holder / Company: | Peko Wallsend Operations |
Report id: | CR1993-0357 |
Tenure: | MCC1032; MCC1033; MCC1038; MCC1039 |
Year: | 1993 |
Author: | Archibald, DAC |
Abstract: | Work completed at Metallic Hill included gridding, 13.2 line kilometres gravity and ground magnetics, 729 vacuum drill holes totalling 1794.2m, 13 RAB holes totalling 546m and 4 RC holes totalling 258m. The vacuum drill holes were disappointing. RAB-RC intercepted low grade mineralisation around the eastern portion of Magnetic Hill, number 1 lode and the eastern extension to the number 3 lode (maximum 3m at 0.27g-t Au). |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19930357.pdf | 6.95 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.