Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/68870
Export to Endnote
Title: Combined annual report MCCs 1032, 1033, 1038 and 1039 16 November 1991 to 15 November 1992.
Title Holder / Company: Peko Wallsend Operations
Report id: CR1993-0357
Tenure: MCC1032;  MCC1033;  MCC1038;  MCC1039
Year: 1993
Author: Archibald, DAC
Abstract: Work completed at Metallic Hill included gridding, 13.2 line kilometres gravity and ground magnetics, 729 vacuum drill holes totalling 1794.2m, 13 RAB holes totalling 546m and 4 RC holes totalling 258m. The vacuum drill holes were disappointing. RAB-RC intercepted low grade mineralisation around the eastern portion of Magnetic Hill, number 1 lode and the eastern extension to the number 3 lode (maximum 3m at 0.27g-t Au).
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19930357.pdf6.95 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader