Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/68605
Export to Endnote
Title: | Centre Basins Cu EL 9334 New Year Dam, EL 9336 Mt Ooraminna, EL 9338 Eagle Bore and EL 9339 Mt Burrell, Final Report |
Title Holder / Company: | Rio Tinto Exploration |
Report id: | CR1998-0564 |
Tenure: | EL9334; EL9336; EL9338; EL9339 |
Year: | 1998 |
Author: | Davies, A |
Abstract: | In year one, stream, soil and rock chip sampling was completed, whilst in year two RAB drilling was completed, details can be obtained in the relevant annual reports. In year three, rock chip sampling was completed within EL 9339 with low results obtained, in addition a detailed geological map was compiled for the same area. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19980564.pdf | 13.18 MB | Add | |
CR1998-0564_Data.zip | 3 kB | ZIP | Add |
CR1998-0564_Geophysics.zip | 11.68 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.