Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/68574
Export to Endnote
Title: Fourth annual report ERL74 White Devil Mine, Tennant Creek District.
Title Holder / Company: Peko-Wallsend Operations
Tennant Creek Operations
Report id: CR1992-0089
Tenure: ERL74;  MLC687
Year: 1992
Author: Lindsay-Park, K
Abstract: One deep RC-diamond drill hole totalling 694m tested the eastern extension of the White Devil mineralised system. Assay results were disappointing, though it did demonstrate that the White Devil Ironstone and alteration extended into ERL0074. Seven RC-diamond drill holes totalling 1211m were drilled to test the up plunge extent of the White Devil mineralisation. The mineralised system was intersected but assay results were poor. 10 underground diamond drill holes totalling 1575.2m provided encouragement for further extensions to mineralisation. Report does not contain contour maps of ground magnetics or gravity data as processing still under way at the time of reporting.
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19920089.pdf15.1 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader