Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/68572
Export to Endnote
Title: | Annual report EL 6929 Tennant Creek Mineral Field. |
Title Holder / Company: | Peko-Wallsend Operations |
Report id: | CR1991-0570 |
Tenure: | EL6929 |
Year: | 1991 |
Author: | Lindsay-Park, K |
Abstract: | Preliminary analysis of structural mapping suggests that gold mineralisation is controlled by late cross cutting faults-shear zones along which mineralising fluids have reacted with the haematite rich Warramunga Group. Geophysical interpretation is underway. Results are as yet unavailable. Results from mapping are to be included in the next annual report. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19910570.pdf | 140.67 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.