Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/67929
Export to Endnote
Title: | Annual report on ERL 56 period ending March 1985 - March 1986. |
Title Holder / Company: | Western Mining |
Report id: | CR1986-0107 |
Tenure: | ERL56 |
Year: | 1986 |
Author: | Warren, H Woolrich, P |
Abstract: | Stream silt sampling was carried out around Bundey 1 as orientation for the regional stream survey. Strong gold and weak arsenic responses were demonstrated. Vein sets exposed in costeans at Bundey 1 were selectively sampled to investigate the distribution of gold in veins of various attitudes. Most significant mineralization is confirmed to occur in veins dipping steeply east with strikes of 125degrees - 160degrees. This vein orientation is adequately tested by the predominantly west-inclined drill hole pattern employed to date. Further detailed mapping and sampling of Buadey 1 costeans was undertaken, adding modestly to the interpreted possible in situ resource. Other work included continued operation of the meteorological recording station, and inspection of the Dl prospect. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19860107.pdf | 2.76 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.