Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/66350
Export to Endnote
Title: Annual report on EL 8604 for year two, Woodcutters area, 25 July 1996 to 24 July 1997
Title Holder / Company: Normandy Woodcutters
Report id: CR1997-0494
Tenure: EL8604;  MLN11;  MLN1106;  MLN12;  MLN323;  MLN324;  MLN325
Year: 1997
Author: Williams, KA
Abstract: Diamond drill hole S1214 was designed to test the southern extent of the '2' structure which is one of the controlling structures of the Woodcutters ore body. The structure was intersected but was unmineralized. Diamond drill hole S1216 was planned to intersect a gossanous structure coincident with high gold and lead geochemistry and the 'CS' dolerite horizon at Whites Formation. No mineralization was encountered.
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19970494.pdf1.3 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader