Title: Exploration retention licence 147, Edna Beryl, third annual report 13 March 1998 - 12 March 1999
Title Holder / Company: Giants Reef Exploration
Report id: CR1999-0240
Tenure: ERL147
Year: 1999
Author: Simpson, PG
Abstract: Feasibility studies of the Edna Beryl Eastern Shoot are ongoing. A sample of gold bearing waste was tested by a Siroll Mill, however it was observed that the accelerator blocks within the jaw crusher had a high rate of wear, hence the mill was found to be inefficient. Mine design and quotes for mining are currently underway, also additional equipment procurement is being completed. At Edna Beryl three coreholes were completed with hole EBRD5 intersecting 2.05m @ 123.9 g/t Au, with 2 other holes intersecting marginal ore. Magnetic modelling was completed at the Milligal, Thrace, Macedon and Olympus prospects. These were subsequently RC drilled with poor results obtained.
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19990240.pdf6.13 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader