Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/63741Export to Endnote
| Title: | Report on MCNs 1987. |
| Title Holder / Company: | Greenbushes |
| Report id: | CR1988-0090 |
| Tenure: | MCN269; MCN270; MCN271; MCN272 |
| Year: | 1988 |
| Author: | Hatcher, MI |
| Abstract: | BP 2 Pegmatite; 1984 WORK - The BP 2 pegmatite was mapped and a total of 71 holes and 432.5 m of auger drilling was carried out on this prospect. 183m of trenching in 7 trenches was completed. 139 auger hole samples were processed and assayed. Mammoth Prospect; 1986 WORK - A 25 m grid was placed over the prospect and 155 m of costeaning was completed. Auger drilling totalled 206.5 m. Mammoth Extended; 1986 WORK - The prospect has been mapped at a scale of 1:500 and 51 m of trenching completed. |
| Date Added: | 23-Oct-2013 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| CR19880090.pdf | 638.43 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.