Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/62173
Export to Endnote
Title: Annual report for ELs 7557, 7558 and 7559 Barrow Creek Project, NT, year ending 11-12-1993
Title Holder / Company: Western Mining
Report id: CR1994-0383
Tenure: EL7557;  EL7558;  EL7559
Year: 1994
Author: Norris, MS
Abstract: Work undertaken included a synthesis of available airborne geophysics, semi regional and prospect scale gravity surveys, soil sampling (EL7558-201 samples), auger drilling (99 holes totalling 339m-EL7557) and rock chip sampling (EL7558). Serendipity led to the discovery of the Mt Esther Prospect (EL7558) which in outcrop contains 2 small ironstones (max assay 1450ppm Cu, 1585ppm Bi and 0.89ppm Au). Regional geophysics indicate that these ironstones lie on a coincident magnetic and gravity high. Soil sampling undertaken show Cu-Bi + Au anomalism (max values 7ppb Au, 420ppm Cu and 275ppm Bi). The auger drill programme at Green Prospect (EL7557) returned gold values generally BLD, with a max assay of 3ppb Au. Though the results are disappointing the area is of interest due to a coincident gravity-magnetic high.
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19940383.pdf3.26 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader