Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/61050
Export to Endnote
Title: Final report on exploration for limestone in the Daly River Basin, EL 2067.
Title Holder / Company: Adelaide Brighton Cement
Report id: CR1983-0210
Tenure: EL2067
Year: 1983
Author: Moore, MI
Abstract: This report summarises the work done on limestone exploration on EL 2067 over almost four years. The target specification for quicklime manufacture is less than 4% MgO. For cement manufacture, the grade can be as low as 78% calcium carbonate but the magnesia must be under 2.5% and preferably less than 2%. Several separate reports dealing with drilling and outcrop sampling by Dr Brian Daily are appended. Limestone, marginally suitable for lime manufacture and suitable for cement production occurs in strata of limited thickness. Grade control would be complex due to dolomitisation and silicification. This search was abandoned in favour of shell material occurring closer to Narbalek. Uncertainty in the uranium mining sector, the main consumer, was also a contributing factor.
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19830210.pdf313.74 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader