Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/59972
Export to Endnote
Title: | Partial relinquishment report to 24 May 1993 for Nathan River Project Tenements ELs 7260, 7261, 7262, 7263 and 7264. |
Title Holder / Company: | Ashton Mining |
Report id: | CR1993-0633 |
Tenure: | EL7260; EL7261; EL7262; EL7263; EL7264 |
Year: | 1993 |
Author: | Berents, H Handley, C |
Abstract: | There was no work completed on ground within the relinquished portion of EL7260. 8 stream sediment samples were collected from EL7261 and from EL7262, EL7263 and EL7264 respectively 52, 39 and 5 stream sediment samples were collected. In addition 1 diamond drill hole totalling 287m was completed in EL7262. A TEM survey was also completed. The stream sediment sampling, diamond drill holes and airborne TEM survey have failed to outline any anomalies warranting follow up. Airborne TEM survey line spacing 1000m tie line spacing 15000m. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19930633.pdf | 30.2 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.