Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94856
Export to Endnote
Title: MLN 955 Gove Annual Report 30 May 2018 to 29 May 2019
Title Holder / Company: Swiss Aluminium Australia
RTA Gove
Report id: CR2019-0274
Tenure: MLN955
Year: 2019
Author: Saba, W
Rogers, G
Abstract: During the anniversary period 30 May 2018 to 29 May 2019, Rio Tinto mined approximately 12.0 million dry product tonnes of bauxite at the Gove mining operation. No exploration or evaluation work was carried out. The 2018 Mineral Resource and Ore Reserve estimates were completed during the reporting period. Mineral resources are reported as at 31 December 2018. The total 2018 Mineral Resource (exclusive of Reserve), including Inferred, Indicated and Measured classifications, is 28.3 Mdpt at 48.25% Al2O3 and 6.78% SiO2. The Mineral Resource was calculated with no block grade cut-off, but within a bauxite thickness envelope of at least 1m inside a plateau edge buffer of 25m. Although no cut-off has been applied to the model blocks, a mineralised bauxite envelope with a threshold of <16.0% SiO2 and >40.0% Al2O3 was applied. The Ore Reserves estimated as at 31 December 2018, are 141.7 Mdpt at 49.3% Al2O3 and 6.78% SiO2.
Date Added: 8-Sep-2026
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
MLN955_2019_A_V2.pdf1.15 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader