Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94522Export to Endnote
Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | McMillan, N | - |
| dc.contributor.author | Hunt, D | - |
| dc.date.accessioned | 2026-03-19T22:58:08Z | - |
| dc.date.issued | 2019 | - |
| dc.identifier.govdoc | CR2019-0187 | - |
| dc.identifier.uri | https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94522 | - |
| dc.description.abstract | Activities completed during the reporting period consisted primarily of a diamond drill program and a small geophysical survey over the Teena prospect. The drill program ran from June to October, drilling a total of nine holes (9090.50m). The program focused on characterising mineralisation with infill drilling (at 200m spacings), defining the limits, tenor and grade of mineralisation in the western portion of the deposit, and determining the extent and nature of any mineralisation intersected in the northern shelf portion of the basin. A Large Loop Fixed-Loop Electromagentic Survey (FLEM) was carried out over the Teena basin, with the intention of aiding in further exploration of Pb-Zn systems in the area. The survey hoped to determine the detectability of a Teena style deposit, and by estimating the effective depth of detection, gauge the feasibility of using FLEM to target buried sulphide-hosted massive systems. A wireline survey was attempted on all 2018 drilled holes, to support the geophysical characterization of the Teena mineralised system, aiming to quantify key physical properties. Unfortunately, multiple holes were blocked from surface, and every hole had some blockages, resulting in incomplete data collection. The initial stage of a longer term water monitoring program commenced during 2018, with the installation of five water bores, and surface water sampling program. Water analysis included pH and electrical conductivity levels, as well as the detection of major ions eg. calcium bicarbonate, sulphate and chloride, and dissolved metals eg. arsenic, lead and zinc. This survey also included an investigation to determine the source of the surface water - rainfall derived, or in fed by groundwater. | - |
| dc.subject.classification | Zinc | - |
| dc.subject.classification | Lead | - |
| dc.subject.classification | Precious metals | - |
| dc.subject.classification | Silver | - |
| dc.subject.classification | Geophysical surveys | - |
| dc.subject.classification | Geophysical data | - |
| dc.subject.classification | Ground EM surveys | - |
| dc.subject.classification | Fixed loop EM surveys | - |
| dc.subject.classification | Drilling | - |
| dc.subject.classification | Diamond drilling | - |
| dc.subject.classification | Drill collars | - |
| dc.subject.classification | Drill hole logs | - |
| dc.subject.classification | Drill hole data | - |
| dc.subject.classification | Wire line logging | - |
| dc.subject.classification | Drill core sampling | - |
| dc.subject.classification | Assaying | - |
| dc.subject.classification | Assay value | - |
| dc.subject.classification | Waste management | - |
| dc.subject.classification | Ground water management | - |
| dc.subject.classification | Water bore drilling | - |
| dc.subject.classification | Water bore sampling | - |
| dc.subject.classification | Sampling methods | - |
| dc.title | Reward Project Group Report GR248/12 for the period 24 March 2018 to 23 March 2019, EL 10316, EL 30042, EL 26406, EL 27541, EL 31518 | - |
| dc.relation.isatmap100 | Borroloola 6165 | - |
| dc.relation.isatmap100 | Batten 6065 | - |
| dc.relation.isatmap100 | Glyde 6164 | - |
| dc.relation.isatmap100 | Mallapunyah 6064 | - |
| dc.relation.isatmap250 | Bauhinia Downs SE5303 | - |
| dc.relation.isatgeolprovince | McArthur Basin | - |
| dc.relation.isatgeolprovince | Georgina Basin | - |
| dc.description.geochemicalsampling | 1395 Drill samples | - |
| dc.description.drilling | 6 Monitoring Bores for 107 m (MB_REW01, MB_REW02, MB_REW03, MB_REW04, MB_REW05, MB_REW06) | - |
| dc.description.drilling | 9 Diamond holes for 9,090.50 m (TNDD029, TNDD030, TNDD031, TNDD032, TNDD033, TNDD034, TNDD035, TNDD036, TNDD037) | - |
| dc.description.mineprospectname | Teena Prospect | - |
| dc.identifier.tenure | EL10316 | - |
| dc.identifier.tenure | EL30042 | - |
| dc.identifier.tenure | EL26406 | - |
| dc.identifier.tenure | EL27541 | - |
| dc.identifier.tenure | EL31518 | - |
| dc.description.modifyhistory | 24/06/2019 | - |
| dc.description.modifyhistory | 10/03/2026 | - |
| dc.contributor.holder | Teck Australia | - |
| dc.identifier.collectionname | Minerals Exploration Reports (MEX) | |
| dc.identifier.govdocprefix | CR2019 | |
| local.flag.notified | 1 | en |
| Appears in Collections: | Minerals Exploration Reports (MEX) | |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| GR248_2019_GA.pdf | 2.65 MB | Add | |
| CR2019-0187_Drillhole_Data.zip | 14.03 MB | ZIP | Add |
| CR2019-0187_Geophysics.zip | 1.13 MB | ZIP | Add |
| CR2019-0187_Water_Monitoring.zip | 4.64 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.