Title: Benmara Project Group Report (GR599) EL 31287, EL 32229, EL 32849, EL 32850, EL 33612 and EL 33613 for the period 1st February 2025 to 3rd April 2025; and EL 32228 and EL 32883 for the period 1st February 2025 to 30th September 2025 Group Annual and Final Technical Report
Title Holder / Company: Xavier Resources
Resolution Minerals
Report id: CR2025-0321
Tenure: EL31287;  EL32229;  EL32849;  EL32850;  EL33612;  EL33613;  EL32228;  EL32883
Year: 2025
Author: Price, G
Abstract: This report is the final group technical summary of work carried out by Resolution Minerals Ltd (RML, Resolution) on the Benmara Project. A corporate restructure of Resolution Minerals Ltd occurred during the 2024-25 reporting period which led to a detailed review of the prospectivity of the GR599 group of tenements being conducted. Following completion of this review, a decision was reached to formally halt exploration on GR599. A formal application to surrender all tenements (excluding EL 32228 and EL 32883) was lodged on 3rd April 2025. No field exploration was conducted at GR599 in the final reporting period apart from a rehabilitation program which was finalised in May 2025 at sites where the 2023 diamond drilling was conducted. Area reductions of EL 32228 (effective 29th March 2025) and EL 32883 (effective 17th June 2025) to 4 blocks each were lodged with the DME in June. Applications for the full surrender of EL 32228 and EL 32883 were lodged 13th August 2025 and accepted 30th September 2025.
Date Added: 26-Feb-2026
Appears in Collections:Minerals Exploration Reports (MEX)