Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94400Export to Endnote
| Title: | EL 31543 Illogwa Project Annual and Final Report for the Period 2 January 2024 to 1 January 2025 |
| Title Holder / Company: | Typhon Minerals |
| Report id: | CR2025-0027 |
| Tenure: | EL31543 |
| Year: | 2025 |
| Abstract: | EL 31543 (Project) was located approximately ~145km ENE of Alice Springs and comprised three separate areas. Typhon assessed the potential of the Project for Basil-style Cu-Co sulphide deposits, Ni-Cu-PGE sulphide mineralisation associated with mafic and ultramafic intrusions, as well as bedrock and alluvial Au deposits. The eastern portion of the Project adjoined EL 26942 which covers the Basil Cu-Co deposit. There are a number of prominent faults and shear zones that are interpreted to extend from the Basil deposit into the Project area, however these faults do not appear to be mineralised. Several mafic-ultramafic intrusions were located within the Project area, or were inferred to be located under shallow cover. However, these intrusions are no longer considered to be of economic significance. Assessment of relevant exploration results showed that there no areas of significant geophysical and geochemical anomalism left in the Project area requiring further assessment. EL 31543 expired on 1 January 2025. |
| Date Added: | 21-Nov-2025 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| EL31543_2025_AS_02_Appendix1_Maps.pdf | 3.33 MB | Add | |
| EL31543_2025_AS_01.pdf | 4.36 MB | Add | |
| CR2025-0027_EL31543_2025_AS_03_Appendix2_GIS.zip | 10.51 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.