Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94039
Export to Endnote
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Karpinski, AK | - |
dc.date.accessioned | 2025-07-22T23:30:30Z | - |
dc.date.issued | 2018 | - |
dc.identifier.govdoc | CR2018-0450 | - |
dc.identifier.uri | https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94039 | - |
dc.description.abstract | This is the sixth Annual Report for the EL 29550. The tenement is a result of amalgamation of several exploration licences and it constitutes the Batchelor Project operated by Korab Resources Ltd. EL 29550 was granted on 1 August 2012 and was an amalgamation of previous ELs 24818, 24855, 25133, 25135, 25136, 27683, 27875, 28348 and 28867. In Year 6, work consisted of: site visits, ground truthing of LIDAR, aerial photo and ASTER data, outcrop mapping, assessments of drilling locations, assessments of locations for MMI, rock chip sampling (5 samples). Geochemical re-analysis of rockchip samples collected during 2015, 2016 and analysis of samples taken during 2017 field seasons was conducted during the reporting period. Samples taken during 2018 reporting period were sent to the same contractor Geoexpert International based in European Union. Geoexpert is reviewing the sample assays before they will be sent to us and once we receive them they will be added to the GIS data base and submitted to the DPIR in the 2019 report. The company also continued with the compilation and digitisation of the geochemical, geophysical and geological data from open and close file reports, government data bases and private vendors. Korab also undertook a review of all geochem rock chip drill chip and core drill data on file, focusing on potential for Co, Cu, Ni, Au, Ag, Sn, Zn, Pb and platinum group metals. As well as a review of prior petrographic studies. GIS work included spatial and statistical analysis of geochem data over interpreted structural data. Review of private historical gravity, EM and magnetic survey data was conducted to assess for presence of previously missed anomalies. Reinterpretation was conducted of surface geochemical data for the project in conjunction with review of local geology, this was specifically focusing on a potential for four major target groups of minerals: gold, cobalt/copper lithium bearing pegmatites with tin + tantalum, and platinum group metals. Korab also completed the planning of Falcon microgravity, EM and LIDAR survey. The field work included drilling of 10 RC holes drill program for approximately 1,000 meters. Assay results for 6m composite drill chip samples and the collar locations were reported in 2017 report. The 1m sample assays, lithology and dowhole survey data is reported in this 2018 report. RC drilling to the south of Sundance farm encountered high grade silver mineralisation within Wildman Siltstone. | - |
dc.subject.classification | Precious metals | - |
dc.subject.classification | Gold | - |
dc.subject.classification | Silver | - |
dc.subject.classification | Base metals | - |
dc.subject.classification | Copper | - |
dc.subject.classification | Lead | - |
dc.subject.classification | Zinc | - |
dc.subject.classification | Phosphates | - |
dc.subject.classification | Cobalt | - |
dc.subject.classification | Nickel | - |
dc.subject.classification | Geological setting | - |
dc.subject.classification | Previous exploration | - |
dc.subject.classification | Data compilation | - |
dc.subject.classification | Literature reviews | - |
dc.subject.classification | Drilling | - |
dc.subject.classification | RC drilling | - |
dc.subject.classification | Drill collars | - |
dc.subject.classification | Geochemical exploration | - |
dc.subject.classification | Rock chip sampling | - |
dc.subject.classification | Geochemical data | - |
dc.subject.classification | Geochemical sampling | - |
dc.subject.classification | Drill cuttings sampling | - |
dc.subject.classification | Assaying | - |
dc.subject.classification | Assay value | - |
dc.title | EL 29550 Annual Report for Year 6 Batchelor Project period 1 August 2017 to 31 July 2018 | - |
dc.relation.isatmap100 | Batchelor 5171 | - |
dc.relation.isatmap100 | Noonamah 5172 | - |
dc.relation.isatmap250 | Darwin SD5204 | - |
dc.relation.isatmap250 | Pine Creek SD5208 | - |
dc.relation.isatgeolprovince | Pine Creek Orogen | - |
dc.description.stratname | Mount Deane Volcanic Member | - |
dc.description.stratname | Acacia Gap Quartzite Member | - |
dc.description.stratname | Wildman Siltstone | - |
dc.description.stratname | Whites Formation | - |
dc.description.stratname | Coomalie Dolomite | - |
dc.description.stratname | Zamu Dolerite | - |
dc.description.stratname | Mount Partridge Group | - |
dc.description.stratname | Koolpin Formation | - |
dc.description.stratname | South Alligator Group | - |
dc.description.geochemicalsampling | 5 Rock chip samples (Samples sent Europe for analysis which are still pending) | - |
dc.description.geochemicalsampling | 416 Drill samples | - |
dc.description.drilling | 10 RC holes for 1,052m (KORC17-014, KORC17-015, KORC17-016, KORC17-017, KORC17-018, KORC17-019, KORC17-020, KORC17-021, KORC17-022, KORC17-023) | - |
dc.identifier.tenure | EL29550 | - |
dc.description.modifyhistory | 19/11/2018 | - |
dc.description.modifyhistory | 27/06/2025 | - |
dc.contributor.holder | Korab Resources | - |
dc.identifier.collectionname | Minerals Exploration Reports (MEX) | |
dc.identifier.govdocprefix | CR2018 | |
local.flag.notified | 1 | en |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL29550_2018_A_01.pdf | 6.53 MB | Add | |
CR2018-0450_Data.zip | 106.95 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.