Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/92823
Export to Endnote
Title: | Combined Annual Technical and expenditure report ending 4 May 2020 and estimated work cost for next 12 months |
Title Holder / Company: | Hearl, T |
Report id: | CR2020-0170 |
Tenure: | EL26930 |
Year: | 2020 |
Author: | Hearl, T |
Abstract: | On the 31 July 2019 the renewal of EL 26930 was granted for a further 2 years to enable us to complete our sampling program. Once again in mid August a further 4 weeks were spent continuing our sampling program in the mid lower South-West quadrant of the lease. At this time we had reached our projected expenditure covenant and felt we would complete the sampling program in the 2020-2021 reporting period. However with the arrival of the COVID-19 situation we have, at this point been unable to continue our sampling program and depending on when we can resume work, we may have to apply for a further extension to complete the program. |
Date Added: | 23-Nov-2023 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL26930_2020_A.pdf | 1.18 MB | Add | |
EL26930_2020_A_Genalysis_results_2018-2019_final_submission.csv | 2.76 kB | Unknown | Add |
EL26930_2020_A_SurfaceGeochem_Final.txt | 3.98 kB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.