Title: Combined Annual Technical and expenditure report ending 4 May 2020 and estimated work cost for next 12 months
Title Holder / Company: Hearl, T
Report id: CR2020-0170
Tenure: EL26930
Year: 2020
Author: Hearl, T
Abstract: On the 31 July 2019 the renewal of EL 26930 was granted for a further 2 years to enable us to complete our sampling program. Once again in mid August a further 4 weeks were spent continuing our sampling program in the mid lower South-West quadrant of the lease. At this time we had reached our projected expenditure covenant and felt we would complete the sampling program in the 2020-2021 reporting period. However with the arrival of the COVID-19 situation we have, at this point been unable to continue our sampling program and depending on when we can resume work, we may have to apply for a further extension to complete the program.
Date Added: 23-Nov-2023
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL26930_2020_A.pdf1.18 MBPDF Add
EL26930_2020_A_Genalysis_results_2018-2019_final_submission.csv2.76 kBUnknown Add
EL26930_2020_A_SurfaceGeochem_Final.txt3.98 kBText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader