Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/92799
Export to Endnote
Title: | Combined Annual Technical and expenditure report ending 4 May 2019 and estimated work cost for next 12 months |
Title Holder / Company: | Hearl, T |
Report id: | CR2019-0179 |
Tenure: | EL26930 |
Year: | 2019 |
Author: | Hearl, T |
Abstract: | Work done during the reporting period included literature review of available data including the 1:250 000 map sheet series of 1:100 000 interpreted geological maps; review of gravity, magnetic and radiometric data studied by our geological technical support team; reconnaissance exploration. We successfully continued our sampling program in the 2018-2019 reporting period and were on track to completion within the timeframe set. However a death in my family resulted in a temporary suspension in sampling and we were unable to continue before the wet season arrived. The sampling program was continued in early April 2019 and lost time was made up. Due to the temporary setback we have applied for a renewal and are confident in completing the program in the next 12 month period. |
NOTE: | See CR2020-0170 for Rock Chip Assay Results |
Date Added: | 23-Nov-2023 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL26930_2019_A.pdf | 1.1 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.