Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/92798
Export to Endnote
Title: | EL 32538 and EL 32539 Combined Annual Report for the Period 29 June 2021 to 30 June 2022 |
Title Holder / Company: | Minerals |
Report id: | CR2022-0320 |
Tenure: | EL32538; EL32539 |
Year: | 2022 |
Author: | Ignatieva, S |
Abstract: | The Wave Hill project area includes tenements EL 32538 and EL 32539 granted to Transition Minerals on 29 June 2021. The machine-learning, mineral prospectivity study, conducted in late 2021 over all of Transition Minerals' project areas in the Northern Territory, identified 5 target areas in the Wave Hill project area. An exploration programme was also carried out in late 2021, with the aim of understanding the logistics and access within the Wave Hill project area, and to collect pXRF rock-chip samples to further enhance Transition Minerals' geological understanding of the project area. A total of one rockchip sample was collected from a target area in EL 32539, for which the value for V was 584 ppm. A broader soil and rockchip sampling programme is planned for 2022 to further test the target areas. |
Date Added: | 23-Nov-2023 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR582_2022_GA_01.pdf | 926.79 kB | Add | |
GR582_2022_GA_02_RSC_Machine_Learning_report_for_Transition_Minerals_(public).pdf | 31.78 MB | Add | |
GR582_2022_GA_03_RockChip_pXRF.txt | 4.01 kB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.