Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/92261
Export to Endnote
Title: | Mount Hardy Project Second Group Annual Report EL 27892 17 September 2015 to 16 September 2016, EL 28694 17 September 2015 to 16 September 2016, EL 29219 17 September 2015 to 16 September 2016 |
Title Holder / Company: | TNG Enigma Mining |
Report id: | CR2016-0559 |
Tenure: | EL27892; EL28694; EL29219 |
Year: | 2016 |
Author: | Wetherley, C Grey, K |
Abstract: | The Mount Hardy project is located approximately 300 km north-west of Alice Springs in Northern Territory. The project comprises three exploration licences (EL 27892, EL 28694 and EL 29219) which lie in the Aileron Province of the northern Arunta region. The project area contains the historical Mount Hardy Copper Field where known copper mineralisation exists within the highly prospective Lander Group. The project area is accessed via the Tanami Road and is situated on the Mount Doreen pastoral lease (NT Portion 1947 under Perpetual Pastoral Lease 1035). Recommendations from a September 2015 Field Inspection by the DME were implemented during rehabilitation completed in October 2015. An assessment of the project area was undertaken and EL 28694 was reduced by 50%. |
Date Added: | 3-Aug-2022 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR372_2016_A_01.pdf | 1.16 MB | Add | |
GR372_2016_A_02_Appendix1_RehabilitationReport.pdf | 4.64 MB | Add | |
GR372_2016_A_03_Verification_List.txt | 409 B | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.