Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91863
Export to Endnote
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.date.accessioned | 2021-11-11T23:17:55Z | - |
dc.date.issued | 2013 | |
dc.identifier.govdoc | PR2013-0011 | |
dc.identifier.uri | https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91863 | - |
dc.description.abstract | This report mainly documents the results and outcomes of drilling at the Glyde 1 and Glyde 1 ST1 in August 2012 and the results and interpretation of the gravity-magnetic-digital terrain airborne survey over a selected portion of the Glyde Sub-basin by Fugro in January 2013. The Glyde 1 and Glyde 1 ST1 was spud in late July-2012 to target a report of gas from the GR-9 well drilled in 1979 by Amoco. Fugro Airborne Surveys conducted a high-sensitivity aeromagnetic and FALCON Airborne Gravity Gradiometer (AGG) survey over the Glyde Sub Basin survey area. The survey was carried out between 31st December 2012 and 5th January 2013 to acquire a total of 4272 Km of data. The purpose of the survey was to define the subsurface structure hidden beneath the Cambrian Bukalara Sandstone and to help design a potential seismic or magnetotelluric survey in adverse topographic terrain over lows and highs generated from the first derivative gravity grid. A number of positive/negative anomalies and trends were picked up by the survey. A tectono-structural interpretation model of the permit area was generated incorporating the newly acquired data and various other existing data with the help of a GIS system. | |
dc.subject.classification | Regional Geophysical Interpretation | |
dc.subject.classification | Mineralogy | |
dc.subject.classification | Spectroscopy | |
dc.subject.classification | Engineering - Testing | |
dc.subject.classification | Geological Models | |
dc.subject.classification | Geological Assessment | |
dc.subject.classification | Prospectivity | |
dc.title | Annual Activity and expenditure Report for the Period: 29 June 2012 to 28 June 2013 | |
dc.relation.isatmap100 | Batten 6065 | |
dc.relation.isatmap100 | Borroloola 6165 | |
dc.relation.isatmap100 | Glyde 6164 | |
dc.relation.isatmap100 | Lancewood 6163 | |
dc.relation.isatmap100 | Mallapunyah 6064 | |
dc.relation.isatmap250 | Bauhinia Downs SE5303 | |
dc.relation.isatmap250 | Wallhallow SE5307 | |
dc.relation.isatgeolprovince | McArthur Basin | |
dc.identifier.tenure | EP171 | |
dc.description.publicnotes | Sections 6 and 7 on pages 44 and 45 of the report redacted. HyLogger data can be obtained from the NVCL on the AusGIN Geoscience Portal. | |
dc.description.publicnotes | Glyde 1 Gas Analysis Report and Data can also be found in PR2016-W009. | |
dc.description.publicnotes | Kilgour North 1 Gas Analysis Report and Data can also be found in PR2016-W010. | |
dc.contributor.corpauthor | Armour Energy | |
dc.contributor.holder | Armour Energy | |
dc.identifier.collectionname | Petroleum and Geothermal Tenure Reports (PEX Tenure) | |
dc.identifier.govdocprefix | PR2013 | |
dc.identifier.surveyname | Glyde AGMS 2012 | |
local.flag.notified | 1 | |
Appears in Collections: | Petroleum and Geothermal Tenure Reports (PEX Tenure) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
PR20130011_Annual_Activity_Report_EP171_Armour_Energy.pdf | 2.6 MB | Add | |
PR2013-0011_Batten_Trough_Hylogged_Data.zip | 75.63 MB | ZIP | Add |
PR2013-0011_Cuttings_and_Gas_Samples.zip | 19.02 kB | ZIP | Add |
PR2013-0011_Gas_Analysis_Data.zip | 1.55 MB | ZIP | Add |
PR2013-0011_Gravity_Data.zip | 121.12 MB | ZIP | Add |
PR2013-0011_Hydrocarbon_Feasibility_Study.zip | 1.03 GB | ZIP | Add |
PR2013-0011_Photogeology_Data.zip | 421.22 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.