Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91710
Export to Endnote
Title: | Annual Report GR328 ELR 41 and ELR 45-55 period ending 17 November 2015 |
Title Holder / Company: | Energy Metals |
Report id: | CR2015-0874 |
Tenure: | ELR41; ELR45; ELR46; ELR47; ELR48; ELR49; ELR50; ELR51; ELR52; ELR53; ELR54; ELR55 |
Year: | 2015 |
Author: | Jordan, D Kerr, S Liu, J Taylor, W |
Abstract: | Because of the present depressed state of the uranium market and consequent limitations on the JV budget, exploration work undertaken in the current reporting period was reduced to a minimum. The only significant work completed during the period was rehabilitation work at A15 (mainly ELR 55) and a maiden JORC resource estimate of 7,456 tonnes U3O8 at the Walbiri and satellite deposits. |
Date Added: | 29-Jul-2021 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR328_2015_GA_01.pdf | 21.72 MB | Add | |
GR328_2015_GA_03_Appendix1_COLL2015A.txt | 5.48 kB | Text | Add |
GR328_2015_GA_03_Appendix1_GEOP2015A.txt | 3.13 MB | Text | Add |
CR2015-0874_GR328_2015_GA_04_Appendix1_Walbiri_Satellite_Deposits_Resource_Estimate_ASX.pdf | 7.16 MB | Add | |
GR328_2015_GA_05_Appendix2_Low_Ecological_Services_Rehabilitation_Report.pdf | 2.66 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.