Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91643
Export to Endnote
Title: Annual Report ML 29678 period 27 September 2014 to 26 September 2015
Title Holder / Company: Resolution Investments (NT)
Report id: CR2015-0784
Tenure: ML29678
Year: 2015
Author: Jettner, WA
Abstract: Geological activities undertaken in the 2014-2015 exploration year consisted of a channel sampling program to define a bulk sample, part of which was sampled during the year. The bulk sample consisted of 720t of a permitted 2500t which was excavated and moved to another site where it was processed. Unfortunately the facility's crushing system did not perform to expectations and would not crush to the desired size. The crushing plant would crush to -500micrometer on quartz feed but due to the softness of the ore it would only crush to -2mm which was too coarse to liberate the gold. The program was suspended at this point and it is planned to recommence in 2016 after additional laboratory testwork has been conducted.
Date Added: 7-Jul-2021
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
ML29678_2015_A_01.pdf2.26 MBPDF Add
ML29678_2015_A_02_SurfaceGeochem.txt2.96 kBText Add
ML29678_2015_A_03_Exp_Index_Map.pdf611.51 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader