Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91317
Export to Endnote
Title: | Gidyea Ninth Annual Report for EL 27821 for the period 26 August 2018 to 25 August 2019 |
Title Holder / Company: | Australian Minera Resources |
Report id: | CR2019-0460 |
Tenure: | EL27821 |
Year: | 2019 |
Author: | Ji, H |
Abstract: | No site disturbance work has taken place in this operation year. The tenement has MMP in place this year, however, the whole programme was delayed further because of unavailability of drilling contractor until beyond the term of the EL. Our geologist has been keeping in touch with main contractors. |
Date Added: | 28-Mar-2021 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL27821_2019_A.pdf | 5.75 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.