Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91217
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorRaffan, Nen_US
dc.date.accessioned2021-02-04T23:45:52Z-
dc.date.issued2015en_US
dc.identifier.govdocCR2015-0021en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91217-
dc.description.abstractMineral Exploration Licences (EL) 29239 and 29237 were granted to Ebony Coal Ltd (Ebony) on January 4, 2013 for a term of 6 years. Ebony Coal Ltd changed name to Ebony Energy Limited (Ebony) on 11 December 2014. These two ELs are the southern tenements of the Hale River Project. Ebony is exploring for unconventional energy sources in the Pedirka Basin. The 2014 work programme was focused on the southwest corner of EL 29239 which is located about 230km southeast of Alice Springs. EL 29239 comprises 202 sub-blocks (604.22 sq. km) and adjoins the north boundary of EL 29237. EL 29237 comprises 187 sub-blocks (580.61 sq. km).During the Y-2 reporting period the work programme comprised of further desktop studies and the completion of one borehole, DH-1R. This was a proof of concept drill hole to determine coal seam thicknesses and gather samples for coal analysis and samples of interburden for porosity and permeability measurements. Borehole DH-1R consisted of HQ open-hole, PDC and HQ diamond coring. The first borehole DH-1 was abandoned at a vertical depth of 102 metres. DH-1R was drilled 3 metres from DH-1 to a depth of 622 metres. Drilling conditions were challenging and the planned depth of 840 metres was not reached. DH-1R did not penetrate the entire Pedirka Basin sequence. However, DH-1R was successful, intersecting four significant coal seams, two of which exceeded 10 metres in thickness: Seam D, 11.5m & Seam F, 10.4m. Other significant seams were E, 2.5m and G 7.7m. DH-1R was logged by Precision Energy Services (Aust) Pty Ltd. Twelve core samples of coal were sent for analysis and six core samples of sediment were sent for porosity and permeability measurements. A Borehole Report was prepared by Tamplin Resources Pty and is an Attachment to this report. A map locating DH-1R is shown in Figure 1. Planning for further Stage-2 drilling activities during 2015 has started. Stage-2 will focus on progressing towards a JORC compliant resource and gathering of hydrological data.en_US
dc.subject.classificationCoalen_US
dc.subject.classificationCoal seamsen_US
dc.subject.classificationExploration rationaleen_US
dc.subject.classificationPrevious explorationen_US
dc.subject.classificationGeologyen_US
dc.subject.classificationRegional geologyen_US
dc.subject.classificationReviewsen_US
dc.subject.classificationDrillingen_US
dc.subject.classificationDiamond drillingen_US
dc.subject.classificationDrill hole logsen_US
dc.subject.classificationDrill hole dataen_US
dc.subject.classificationDown hole geophysicsen_US
dc.subject.classificationDrill core analysisen_US
dc.subject.classificationPermeabilityen_US
dc.subject.classificationPorosityen_US
dc.titleSecond Annual Report Combined Reporting GR347 Hale River Project for the year 4 January 2014 to 3 January 2015en_US
dc.relation.isatmap100Andado 5947en_US
dc.relation.isatmap100Nuckua 6047en_US
dc.relation.isatmap100Poodinitterra 6048en_US
dc.relation.isatmap250McDills SG5307en_US
dc.relation.isatmap250Hale River SG5303en_US
dc.relation.isatgeolprovinceEromanga Basinen_US
dc.description.stratnamePurni Formationen_US
dc.description.stratnameCrown Point Formationen_US
dc.description.drilling1 RAB hole for 102 m (DH-1)en_US
dc.description.drilling1 Diamond bore hole for 622 m (DH-1R)en_US
dc.identifier.tenureEL29237en_US
dc.identifier.tenureEL29239en_US
dc.description.modifyhistory13/03/2015en_US
dc.description.modifyhistory13/11/2015en_US
dc.description.modifyhistory01/02/2021en_US
dc.description.modifyhistory05/02/2021en_US
dc.contributor.holderEbony Energyen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)
dc.identifier.govdocprefixCR2015
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR347_2014_A_01_AnnualReport.pdf2.21 MBPDF Add
GR347_2014_A_02_BoreholeReport.pdf7.32 MBPDF Add
GR347_2014_A_03_DownholeAssay.txt3.51 kBText Add
GR347_2014_A_04_DownholeSurvey.txt1.32 kBText Add
GR347_2014_A_05_DrillCollars.txt1.75 kBText Add
GR347_2014_A_06_Lithlogs.txt16.06 kBText Add
GR347_2014_A_07_DH-1R_GN.LAS17.03 MBUnknown Add
GR347_2014_A_08_DH-1R_GT.LAS206.7 kBUnknown Add
GR347_2014_A_09_DH-1R_VT.LAS29.09 kBUnknown Add
GR347_2014_A_10_Filelisting.txt332 BText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader