Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90706
Export to Endnote
Title: Combined Annual Exploration Report Rover Project EL 24541, EL 25511, EL 27039, ELR 29957 and ELR 29958 year ending 7 March 2014
Title Holder / Company: Castile Resources
Metals X Group
Report id: CR2014-0231
Tenure: EL24541;  EL25511;  EL27039;  ELR29957;  ELR29958
Year: 2014
Author: Burke, R
Abstract: No major on the ground exploration activities were completed for the year ending 7 March 2014. Advance stage targeting was conducted throughout the field to investigate any relationships from all data sources. This has highlighted multiple targets for follow-up IP and drill testing including the Explorer 120 target and Explorer 108 region. All IP data including reports were received from the geophysicist, which were utilised in most targeting exercises. The IP modelling has led to generated targets through the Explorer 108 region, however did not highlight any significant anomalies through the Navigator field associated with a large linear NW striking EM anomaly. Additionally Castile advanced exploration decline studies for the Rover 1 Project inclusive of submission of the Rover 1 Decline Proposal to the Northern Territory Department of Resources. Recently, EL 24989 and two blocks of EL 24541 covering the Rover 1 deposit were transferred into ELR 29958 and ELR 29957 (Exploration Licence in Retention). This represents a significant step toward further development at Rover 1.
Date Added: 10-Sep-2020
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR107_2014_GA.pdf1.51 MBPDF Add
CR2014-0231_Geophysics.zip12.18 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader