Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90694
Export to Endnote
Title: EL 29882 and EL 29886 Mount Todd Project Combined Annual Report for the period ended 14 March 2014
Title Holder / Company: Vista Gold
Report id: CR2014-0275
Tenure: EL29882;  EL29886
Year: 2014
Author: Harris, P
Abstract: EL's 29882 and 29886 are situated approximately 40 km east of the town of Pine Creek. This annual report documents the work completed on the licences for the period from 15 March 2013 to 14 March 2014. The ELs as they stand are the result of a consolidation and split of EL 25576, EL 25670, EL 25668 and EL 25669 which occurred on the 16/09/2013. Vista Gold Australia Pty Ltd. is the sole operator and manager of the exploration work. Work on the project during the Reporting Year included rock chipping (246 samples), extensive soil sampling (2601 samples), and mapping. Grab sampling was conducted on various targets distributed between both EL's. Of particular interest is the Emerald Creek area where the bulk of the soil sampling took place. Soils also occurred on Blanchards and on Snowdrop, to close off the Anomaly to the South. Smaller soils programs also occurred at Fergusson's investigating historic copper working. Work was curtailed on the EL's following sever budgetary and staff cuts that occurred in late 2013 and has meant that unfortunately expenditure commitments were not met on EL 29886.
Date Added: 8-Sep-2020
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR087_2014_A_01.pdf2.78 MBPDF Add
GR087_2014_A_02_AppendixA.pdf1.27 MBPDF Add
GR087_2014_A_03_Soil_Samples.pdf203.28 kBPDF Add
GR087_2014_A_04_Rockchip_Samples.pdf37.12 kBPDF Add
GR087_2014_A_05_SoilGeochem.txt265.88 kBText Add
GR087_2014_A_06_Rockchip.txt46.82 kBText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader