Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90581
Export to Endnote
Title: | Carrara Project Combined Annual Report for the period 21st January 2018 to 20th January 2019 |
Title Holder / Company: | Teck Australia |
Report id: | CR2019-0066 |
Tenure: | EL29557; EL29560; EL29793; EL29794; EL30665; EL30816; EL31538 |
Year: | 2019 |
Author: | Reed, A |
Abstract: | This document is submitted as a group report (GR329) for EL's 29557, 29560, 29793, 29794, 30665, 30816 and EL 31538 which comprise the Carrara Project. The Carrara project is deemed prospective for shale-hosted massive sulphide deposits (SHMS) containing zinc (Zn), lead (Pb) and silver (Ag). The Project area lies hosts lateral equivalents to the Lawn Hill Platform's Upper McNamara Group members, which hosts the world class Century deposit. Ground was applied for in 2012 and 2015 following a preliminary desktop study by Teck's Zn Generative team. No field activities were undertaken on the licence block during the previous reporting period. Desktop work included review of the available seismic and geophysics. There was a partial relinquishment of EL 29557. |
Date Added: | 25-Aug-2020 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR329_2019_GA.pdf | 3.66 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.