Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90537
Export to Endnote
Title: | McArthur Project Partial Surrender Report EL 31704 8 May 2018 to 7 May 2020 |
Title Holder / Company: | Todd River Metals |
Report id: | CR2020-0188 |
Tenure: | EL31704 |
Year: | 2020 |
Author: | Wetherley, C |
Abstract: | The McArthur River Project is operated by Todd River Metals Pty Ltd, a wholly owned subsidiary of Todd River Resources Limited. The project comprises four exploration licences, EL 27711, EL 30085, EL 31703 and EL 31704, which lie in the McArthur Basin and in the southwestern portion of the Batten Fault Zone. Group reporting was approved in May 2015 (GR367) with a reporting period of 9 July to 8 July. EL 31703 and EL 31704 were added to this group reporting in January 2019. A partial surrender of EL 31704 from 70 blocks to 31 blocks was undertaken at the second anniversary of the licence. No exploration has been undertaken on the surrendered blocks. |
Date Added: | 28-Jul-2020 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL31704_2020_P.pdf | 1.15 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.