Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90481
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKerr, S
dc.contributor.authorLiu, J
dc.contributor.authorTaylor, W
dc.date.accessioned2020-06-22T01:37:22Z-
dc.date.issued2014
dc.identifier.govdocCR2013-1113
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90481-
dc.description.abstractDue to the present, depressed state of the uranium market and consequent limitations on the JV budget, exploration work undertaken in the current reporting period was set at minimum levels by the JV partners. Nevertheless a gradient array induced polarisation (GA-IP) survey was undertaken over the A4 and A15 ore bodies as an orientation trial to determine whether the technique would be useful in targeting prospective Mt Eclipse sandstone under cover. The survey yielded promising results for detection of reduced sandstone units and redox boundaries under thin sand cover and the technique was applied to nearby prospects on the adjacent EL 24453 in 2013 with some success. Additional work undertaken during the period included collection of bulk density data and on-going radiation and environmental baseline studies. If uranium market conditions allow an increase in the JV budget, then it is planned in the short term to undertake a program of resource expansion drilling mainly at the A2 and A15 deposits, together with optimisation of various technical aspects of the project including metallurgy, pit design and geotechnical investigation; these studies will build on the Bigrlyi Project Pre-Feasibility Study of March 2011. Positive results from this work combined with improved market conditions will lead to a decision to go to a Definitive Feasibility Study (DFS) in 2015-2016.
dc.subject.classificationUranium
dc.subject.classificationGeophysical surveys
dc.subject.classificationGeophysical data
dc.subject.classificationGradient array
dc.subject.classificationIP surveys
dc.subject.classificationPhysical properties
dc.subject.classificationDensity
dc.subject.classificationSpecific Gravity
dc.subject.classificationRadiation
dc.subject.classificationEnvironmental management
dc.titleAnnual Report ELRs 46 to ELR 55 Bigrlyi Project period ending 17 November 2013
dc.relation.isatmap100Vaughan 5053
dc.relation.isatmap100Doreen 5153
dc.relation.isatmap250Mount Doreen SF5212
dc.relation.isatgeolprovinceNgalia Basin
dc.description.stratnameMount Eclipse Sandstone
dc.description.mineprospectnameBigrlyi
dc.identifier.tenureELR46
dc.identifier.tenureELR47
dc.identifier.tenureELR48
dc.identifier.tenureELR49
dc.identifier.tenureELR50
dc.identifier.tenureELR51
dc.identifier.tenureELR52
dc.identifier.tenureELR53
dc.identifier.tenureELR54
dc.identifier.tenureELR55
dc.description.modifyhistory21/03/2014
dc.description.modifyhistory18/05/2016
dc.description.modifyhistory16/06/2020
dc.contributor.holderEnergy Metals
dc.identifier.collectionnameMinerals Exploration Reports (MEX)
dc.identifier.govdocprefixCR2013
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR328_2013_GA_01.pdf1.46 MBPDF Add
GR328_2013_GA_02_GeoMap_2011.pdf82.07 MBPDF Add
CR2013-1113_2013_Bigrlyi_Annual_Report_Appendix1.zip3.1 MBZIP Add
CR2013-1113_Geophysics.zip1.11 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader