Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90172
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorHope, Den_US
dc.date.accessioned2020-04-28T06:16:21Z-
dc.date.issued2013en_US
dc.identifier.govdocCR2013-0626en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90172-
dc.description.abstractGroote Eylandt is predominantly composed of a stable basement of Proterozoic quartz sandstones and quartzites. The overlying manganese deposits are part of a blanket of Cretaceous sediments lapping onto the western margin of the Proterozoic basement sandstones and quartzites of the McArthur Basin. The manganese orebody is a sedimentary layer, consisting of manganese strata occurring between clay and sand beds and gently undulates beneath the western plains of the island. It extends over an area of about 50 square kilometres as an almost continuous horizon ranging in thickness up to 11 metres. The ore body is thus essentially stratabound and strataform in character. A number of drilling campaigns were conducted during the reporting period. To increase the confidence in the resource and to convert resource into reserve, an RC resource definition drilling program was carried out. A total of 783 Reverse Circulation (RC) holes were drilled for 20,173m. Diamond drilling was carried out in order to update geometallurgical assumptions and to develop a short term mining model. A total of 173 diamond holes were drilled totalling 4,043m. Minor drilling and soil testing was also carried out for the installation of environmental ground watering bores, 11 holes were drilled totalling 87 metres. In addition, minor drilling was completed on selected existing and planned tailings dams for SPT testing and for the installation of piezometers, 14 holes were drilled for a total of 242m. As part of the East Arnhem Exploration Programme, 4 deep diamond core holes were drilled on the mining leases in order update current understanding of the stratigraphic and biostratigraphic setting of the orebody. Lastly, three aerial surveys were conducted in order to obtain orthoimagery and LIDAR data of the mining areas.en_US
dc.subject.classificationManganeseen_US
dc.subject.classificationManganese depositsen_US
dc.subject.classificationManganese oresen_US
dc.subject.classificationGeologyen_US
dc.subject.classificationProterozoicen_US
dc.subject.classificationStratigraphyen_US
dc.subject.classificationAerial photographyen_US
dc.subject.classificationLiDAR Surveyen_US
dc.subject.classificationDrillingen_US
dc.subject.classificationRC drillingen_US
dc.subject.classificationDiamond drillingen_US
dc.subject.classificationAuger drillingen_US
dc.subject.classificationStratigraphic drillingen_US
dc.subject.classificationBiostratigraphyen_US
dc.subject.classificationDrill hole logsen_US
dc.subject.classificationDrill hole dataen_US
dc.subject.classificationDrill core samplingen_US
dc.subject.classificationDrill cuttings samplingen_US
dc.subject.classificationGeochemical dataen_US
dc.subject.classificationAssayingen_US
dc.subject.classificationAssay valueen_US
dc.subject.classificationMineral resourcesen_US
dc.subject.classificationInferred mineral resourcesen_US
dc.subject.classificationIndicated mineral resourcesen_US
dc.subject.classificationMeasured mineral resourcesen_US
dc.subject.classificationOre reservesen_US
dc.subject.classificationProved ore reservesen_US
dc.subject.classificationProbable ore reservesen_US
dc.title2013 Group Technical Report, GR159-10, MLN 2, MLN 3, MLN 951, MLN, 952, MLN 953, MLN 956, MLN 957, MLN 958, MLN 959, MLN 960, and MLN 961, 1 July 2012 to 30 June 2013en_US
dc.relation.isatmap100Bickerton 6170en_US
dc.relation.isatmap100Tasman 6169en_US
dc.relation.isatmap250Blue Mud Bay SD5307en_US
dc.relation.isatmap250Roper River SD5311en_US
dc.relation.isatgeolprovinceCarpentaria Basinen_US
dc.description.geochemicalsampling632 Diamond core samplesen_US
dc.description.geochemicalsampling8,948 RC drill samplesen_US
dc.description.drilling4 Stratigraphic holes for 297.8 men_US
dc.description.drilling11 Water bores for 87.05 m (TDMW11 to TDMW17, SRK1 to SRK4)en_US
dc.description.drilling14 SPT test holes and piezometer installation holes for 242.3 m (Bore 4 to Bore 6, Bore 13-01 to Bore 13-05, TDMW23 to TDMW28)en_US
dc.description.drilling173 Diamond holes for 4,043.6 m (GC18000 to GC18037, GC18040 to GC18177, GC18079 to GC18107, GC18109 to GC18112, GC18114 to GC18179)en_US
dc.description.drilling783 RC holes for 20,173 m (RC18001 to RC18831)en_US
dc.identifier.tenureMLN2en_US
dc.identifier.tenureMLN3en_US
dc.identifier.tenureMLN951en_US
dc.identifier.tenureMLN952en_US
dc.identifier.tenureMLN953en_US
dc.identifier.tenureMLN956en_US
dc.identifier.tenureMLN957en_US
dc.identifier.tenureMLN958en_US
dc.identifier.tenureMLN959en_US
dc.identifier.tenureMLN960en_US
dc.identifier.tenureMLN961en_US
dc.description.publicnotesSee CR2014-0645 for LiDar Dataen_US
dc.description.modifyhistory02/09/2013en_US
dc.description.modifyhistory16/04/2020en_US
dc.description.modifyhistory28/04/2020en_US
dc.contributor.holderGroote Eylandt Mining Companyen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)
dc.identifier.govdocprefixCR2013
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR159_2013_GA_01.pdf5.68 MBPDF Add
GR159_2013_GA_02_AppendixA.pdf8.53 MBPDF Add
CR2013-0626_GR159_2013_GA_AppendixB.zip9.2 MBZIP Add
CR2013-0626_GR159_2013_GA_AppendixC.zip805.1 kBZIP Add
CR2013-0626_GR159_2013_GA_AppendixD.zip95.26 MBZIP Add
CR2013-0626_GR159_2013_GA_AppendixF.zip23.95 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader