Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89982
Export to Endnote
Title: Partial Relinquishment Report for EL 31234 report period 13 October 2017 to 12 October 2019
Title Holder / Company: Independence Group
Report id: CR2019-0551
Tenure: EL31234
Year: 2019
Author: McGloin, M
Abstract: This report summarises the partial relinquishment of tenement EL 31234. In the reporting period (13/10/2017 to 12/10/2019), over the relinquished ground, IGO completed airborne and ground electromagnetic surveys, and where land access permitted, soil sampling. This was part of a wider exploration program across the Lake Mackay project area. The tenement was also subject to a site heritage clearance by the Central Land Council. No significant exploration targets were found in the relinquished areas. IGO have relinquished ground for three reasons. There were no anomalous geophysical or geochemical results from surveys conducted. There was limited access to some areas due to exclusion zones. Some areas were also relatively unexplorable with current geophysical and geochemical methods because ground was covered in sand dunes, had significant depth of cover to targeted stratigraphy, or covered non-prospective geology. This made drilling and further exploration impractical. No further work is recommended on the relinquished ground.
Date Added: 18-Mar-2020
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL31234_2019_P.pdf944.62 kBPDF Add
EL31234_2019_P_Figure1.pdf461.04 kBPDF Add
EL31234_2019_P_Figure2.pdf1.13 MBPDF Add
EL31234_2019_P_Figure3.pdf1.84 MBPDF Add
EL31234_2019_P_Figure4.pdf498.99 kBPDF Add
EL31234_2019_P_filelisting.txt793 BText Add
CR2019-0551_Appendix_1.zip30.32 kBZIP Add
CR2019-0551_Appendix_2.zip2.66 kBZIP Add
CR2019-0551_Appendix_3.zip379.14 MBZIP Add
CR2019-0551_Appendix_4.zip339.41 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader