Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89763
Export to Endnote
Title: Annual and Final Report EL 24307, EL 24665, EL 24944, EL 25672 and EL 26992, Roper Bar Project, for the period 6 July 2005 to 27 August 2012
Title Holder / Company: WDR Iron Ore
Report id: CR2012-1259
Tenure: EL24307;  EL24665;  EL24944;  EL25672;  EL26992
Year: 2012
Author: Bennett, A
Abstract: EL 24307, EL 24655, EL 24944, EL 25672 and EL 26992) have been amalgamated into one licence (EL 29548) as of 27 August 2012. This report is the annual and final report for these five amalgamated EL's. The tenements are located about 240 km east of Mataranka in the Gulf Country of the Northern Territory. Exploration is being undertaken for hematitic iron ore within the Sherwin Formation. The Roper Bar project is situated within the Bauhinia Shelf of the McArthur Basin. The McArthur Basin is an intracratonic platform basin of Palaeo to Mesoproterozoic age. Exploration within the area has concentrated on the Sherwin Formation within the Maiwok Subgroup of the Roper Bar Group. Exploration activities carried out during the reporting period included further resource definition and exploratory drilling. The focus was to upgrade confidence in the existing resources at Area F, Area E and Area D for feasibility requirements. To achieve these goals, RC drilling, resource diamond drilling, geotechnical diamond drilling and metallurgical diamond drilling and ore testwork will be conducted.
Date Added: 8-Jan-2020
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR040_2012_AS_01.pdf7.95 MBPDF Add
GR040_2012_AS_02_Appendix4.pdf4.61 MBPDF Add
CR2012-1259_Data.zip5.48 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader