Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89679
Export to Endnote
Title: Fifth Annual Report on EL 25313, EL 28006 and EL 28007 from 1 October 2011 to 30 September 2012 and EL 28951 and EL 28952 from 7 March 2012 to 30 September 2012, Caranbirini, McArthur River Project
Title Holder / Company: Brumby Resources
Report id: CR2012-0839
Tenure: EL25313;  EL28006;  EL28007;  EL28951;  EL28952
Year: 2012
Author: Rohde, C
Abstract: Exploration in the fifth year of tenure carried out by Brumby consisted of reconnaissance survey and diamond drilling of 4 holes for a total of 970.9 meters. The reconnaissance checked the planned drill access and successfully located previous MIM drill holes CP2, CP3 and water bore CW1. The diamond drilling tested a 300 metre deep VTEM anomaly with two holes and two 50 metre deep anomalies with one hole each. Target depth was reached and the conductors intersected. As the drilling was conducted in late September 2012 the geological logging / interpretation and assay results are still awaited. They will be discussed in next year's Annual Report.
Date Added: 30-Dec-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR179_2012_GA_01.pdf2.24 MBPDF Add
GR179_2012_GA_02_COLL2012A.txt2.44 kBText Add
GR179_2012_GA_03_DRIL2012A.txt3.22 kBText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader