Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89476
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorFanning, G
dc.date.accessioned2019-11-04T23:28:21Z-
dc.date.issued2012
dc.identifier.govdocCR2012-0518
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89476-
dc.description.abstractThis report covers activities on EL 28347 granted in June 2011 for a period of six years to Australian Ilmenite Resources P ty Ltd (AIR). A field trip was undertaken in November 2011. The purpose of the field trip was to evaluate additional sites for further sampling. Also consideration was given to the possibility of a bulk sample pit. After the field trip the consultant Geo prepared a summary for discussion on the approach we should take for the coming additional exploration work. The exploration licence is located approximately 130km east of Mataranka in the Roper River region of the Northern Territory. The Project lies in the Urapunga Fault Zone within the Bauhinia Shelf of the Proterozoic McArthur Basin. The area is underlain by sedimentary rocks of the Maiwok Subgroup of the Mesoproterozoic Roper Group. The Kyalla Formation in the area has been extensively intruded by sills of the Derim Derim Dolerite. The exploration target has been heavy minerals associated with the weathering and erosion of dolerite sills within the Mesoproterozoic Roper Group. The area has previously been explored for iron ore, base metals and diamonds. A written request and email reply (see attached) was made to The Department to enable us to provide a presentation to The Titles Advisory Board. The presentation was conducted Friday 20th July 2012. We presented our overall plan and current project status and the difficulties we had in reaching and fulfilling our commitment in the year 2010/2011. We also advised that due to funding restrictions from our Chinese joint venture partners who would not advance funds until we had received the PER from NRETAS. At the above meeting our proposal to the Department was the works programme scheduled for year 2011/2012 now is carried over to year 2012/2013. We have been assured that the PER should be completed in the first half of September 2012 which will trigger the release of the funding requirements from our JV Chinese partners.
dc.subject.classificationHeavy minerals
dc.subject.classificationIron ores
dc.subject.classificationGeology
dc.subject.classificationRegional geology
dc.subject.classificationLocal geology
dc.subject.classificationPrevious exploration
dc.subject.classificationMining history
dc.titleEL 28347 Roper Gulf Region First Annual Report for the period 17 June 2011 to 16 June 2012
dc.relation.isatmap100Mataranka 5568
dc.relation.isatmap100Moroak 5668
dc.relation.isatmap250Urapunga SD5310
dc.relation.isatmap250Katherine SD5309
dc.relation.isatgeolprovinceMcArthur Basin
dc.relation.isatgeolprovinceKalkarindji Province
dc.description.stratnameRoper Group
dc.description.stratnameDerim Derim Dolerite Suite
dc.identifier.tenureEL28347
dc.description.modifyhistory20/08/2012
dc.description.modifyhistory24/01/2013
dc.description.modifyhistory20/09/2019
dc.description.modifyhistory04/10/2019
dc.contributor.holderAustralian Ilmenite Resources
dc.identifier.collectionnameMinerals Exploration Reports (MEX)
dc.identifier.govdocprefixCR2012
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL28347_2012_A_01.pdf244.21 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader