Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88900
Export to Endnote
Title: | Dingo Field Study |
Title Holder / Company: | Magellan Petroleum |
Report id: | PR1995-0045 |
Tenure: | RL2 |
Year: | 1995 |
Corporate Author: | Magellan Petroleum |
Abstract: | This engineering study is based on a brief review of the available Dingo data and a simple numerical simulation of the field. This report was produced in order to provide an indicative gas price for an 8MW Gas fired power station to be constructed at Brewer Estate in Alice Springs. The Dingo gas field is in the very early stages of development and and the geologic and engineering data available is extremely limited. It is strongly recommended that an expanded deliverability test be performed on the reservoir and that a detailed engineering study be performed to prior to the commitment of a Gas Supply Contract. |
Date Added: | 21-Jun-2019 |
Appears in Collections: | Petroleum and Geothermal Tenure Reports (PEX Tenure) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
PR19950045_Dingo_Field_Study.pdf | 2.87 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.