Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88755
Export to Endnote
Title: ELR 148 Annual Report From 26 November 2010 to 25 November 2011
Title Holder / Company: Compass Resources
HNC Australia Resources
Report id: CR2011-1090
Tenure: ELR148
Year: 2011
Author: Rosewall, D
Abstract: During 2011 detailed first pass detailed 3D geophysical modelling was undertaken. As a result of this modelling a number of electromagnetic targets have been generated in ELR 148. There was a delay in this process as some serious acquisition errors were encountered in the overall data. This took a great part of the year to work out and overcome. Column leach testing of the ore and waste material from the proposed Area 55 pit has been ongoing throughout the year. Groundwater monitoring and radon monitoring studies were also completed as part of the environmental approvals process which has now been put on hold. A drill program plan was generated to be undertaken in the first half of the 2012 season. This will be further refined during the upcoming wet season.
Date Added: 30-May-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
ELR148_2011_A_01.pdf427.49 kBPDF Add
CR2011-1090_ELR148_2011_A_02_Areas1_2_XTEM_survey_Evaluation_Summary.pdf6.29 MBPDF Add
CR2011-1090_Geophysics.zip1.2 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader