Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88604Export to Endnote
| Title: | Combined annual report for the period ending 13 October 2011 EL 4170 Cato Plateau and EL 4171 Cato River |
| Title Holder / Company: | Rio Tinto Exploration |
| Report id: | CR2011-0766 |
| Tenure: | EL4170; EL4171 |
| Year: | 2011 |
| Author: | Hartshorn, GK |
| Abstract: | Rio Tinto conducted a work programme meeting and had their plans approved for a limited hand auger sampling programme on a subtle target adjacent Arnhem bay within EL 4171. This programme however was not conducted prior to the reporting period. This area shall be tested in the next annual period. |
| Date Added: | 10-May-2019 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| GR077_2011_GA_01.pdf | 302.95 kB | Add | |
| GR077_2011_GA_02_pAl11_005.pdf | 2.58 MB | Add | |
| GR077_2011_GA_03_pAl11_006.pdf | 2.01 MB | Add | |
| CR2011-0766_Appendix1.zip | 6.18 MB | ZIP | Add |
| CR2011-0766_Appendix2.zip | 3.52 MB | ZIP | Add |
| CR2011-0766_Appendix3.zip | 960.53 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.