Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88434
Export to Endnote
Title: Annual technical report for EL 28857 Second Chance Allamber Project for the period 24 February 2015 to 23 February 2016
Title Holder / Company: Element 92
Thundelarra Exploration
Report id: CR2016-0059
Tenure: EL28857
Year: 2016
Author: Vieru, C
Petrella, L
Abstract: Exploration Licence (EL) 28857 is located about 180 km SSE of Darwin and approximately 50 km NE of Pine Creek. It consists in one block and is part of the Allamber Project and is being explored for copper, gold and uranium mineralisation. The Licence was granted to Element 92 Pty Ltd, a wholly owned subsidiary of Thundelarra Limited on 24 February 2012, it was renewed in 2015 for two years and then will expire on 23 February 2018. The project area is located in the central part of the Pine Creek Orogen which is a folded sequence of Palaeoproterozoic pelitic and psammitic sediments, with interlayered cherty tuff units. These rocks have been intruded by the late-orogenic Palaeoproterozoic granites, causing wide-spread contact/thermal aureole which contains much of the gold and other mineralisation in the Orogen. The geology of the project area is dominated by the Palaeoproterozoic rocks of the Namoona Group, Mount Partridge Group and the members of the Cullen Batholith. Main lithologies are tightly folded dolomites, sandstones, ferruginous shales and quartz-andalusite schists which have intruded by the Allamber Springs Granite. This geological sequence has potential for gold, base metals and uranium mineralisation. During the reporting period, three RC hole were drilled (TAL142RC, TAL143RC and TAL144RC, 510 m deep) and High Powered Downhole Magnetic (HP DHTEM) was conducted on previously drilled TAL126RC. The best interval was intersected in TAL142RC from 165-172 m returning 7 m at 0.22% Cu. The HP DHTEM on TAL126RC identified two off-hole zones of interest and two drill holes are planned for next reporting period (2016) targeting these two zones. EL 28857 continues to offer significant exploration potential which will be the subject of further work programs in 2016.
Date Added: 3-Apr-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL28857_2016_A_01.pdf1.11 MBPDF Add
EL28857_2016_A_02_DrillCollars.txt2.25 kBText Add
EL28857_2016_A_03_Lithology.txt4.73 kBText Add
EL28857_2016_A_04_DHAssay.txt4.24 kBText Add
EL28857_2016_A_05_Surv.txt2.22 kBText Add
EL28857_2016_A_06_Magsusc.txt37.23 kBText Add
EL28857_2016_A_07_Logging_Codes.pdf91.11 kBPDF Add
EL28857_2016_A_08_MetaData.txt1.42 kBText Add
EL28857_2016_A_09_HPDHTEM102015.pdf1.34 MBPDF Add
CR2016-0059_TAL126RC.zip19.46 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader