Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88290
Export to Endnote
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Johansen, G | en_US |
dc.date.accessioned | 2019-03-07T06:05:11Z | - |
dc.date.issued | 2011 | en_US |
dc.identifier.govdoc | CR2011-0201 | en_US |
dc.identifier.uri | https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88290 | en_US |
dc.description.abstract | Given the improved understanding of the prospectivity of EL 24464 it was decided to fly the entire tenement (along with all other Compass tenements at Batchelor) with helicopter borne aeromagnetics and EM. The survey was completed by GPX Surveys in late 2010 with flight lines at 150m spacing, orientated either north-south or east-west depending on the regional stratigraphy strike and with a terrain clearance of 30m. Tie lines were spaced at kilometre intervals. This generated approximately 390 line kilometres of data within EL 24464. Processing of the data commenced in early 2011 and unfortunately an error was detected in the helicopter altimeter readings used in the survey requiring correction and considerable reprocessing. At the time of writing this report Compass Resources was yet to receive the final, corrected data from this extensive survey. | en_US |
dc.subject.classification | Uranium | en_US |
dc.subject.classification | Gold | en_US |
dc.subject.classification | Base metals | en_US |
dc.subject.classification | Geophysical surveys | en_US |
dc.subject.classification | Aerial geophysical surveys | en_US |
dc.subject.classification | Aerial EM surveys | en_US |
dc.title | EL 24464 Mount Mabel Fifth annual report for the year period 11 April 2010 to 10 April 2011 | en_US |
dc.relation.isatmap100 | Reynolds River 5071 | en_US |
dc.relation.isatmap100 | Batchelor 5171 | en_US |
dc.relation.isatmap250 | Pine Creek SD5208 | en_US |
dc.relation.isatgeolprovince | Pine Creek Orogen | en_US |
dc.description.stratname | Waterhouse Complex, Namoona Group, Mount Partridge Group, Geolsec Formation, Depot Creek Sandstone, Tolmer Group | en_US |
dc.description.mineprospectname | Kylie Prospect | en_US |
dc.description.mineprospectname | Waterhouse No. 2 | en_US |
dc.identifier.tenure | EL24464 | en_US |
dc.description.modifyhistory | 12/05/2011 | en_US |
dc.description.modifyhistory | 21/10/2011 | en_US |
dc.description.modifyhistory | 05/10/2016 | en_US |
dc.description.modifyhistory | 01/03/2019 | en_US |
dc.description.modifyhistory | 07/03/2019 | en_US |
dc.contributor.holder | Compass Resources | en_US |
dc.identifier.collectionname | Minerals Exploration Reports (MEX) | en_US |
dc.identifier.govdocprefix | CR2011 | en_US |
local.flag.notified | 1 | |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL24464_2011_A.pdf | 1.48 MB | Add | |
CR2011-0201_Geophysics.zip | 7.93 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.