Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88174
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorButler, Jen_US
dc.contributor.authorLove, Sen_US
dc.date.accessioned2019-01-29T23:42:54Z-
dc.date.issued2010en_US
dc.identifier.govdocCR2010-0793en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88174en_US
dc.description.abstractThis Annual Report for Exploration Tenure 27348 provides a summary of the activities undertaken on the permit since November 2009, including any results produced by these activities. This licence has recently been joined to a group of licences that were assembled to create a large area that could feasibly be exploited as a coal producing area. The area covered by the group licences will be referred to as the Project Area. Tri-Star Energy Company anticipates that it this Project Area will ultimately create a large economic mining project. EL 27348 was granted on 6 November 2009, for a term of six (6) years and is set to expire on 3 November 2015. Tri-Star Energy Company is the sole titleholder of EL 27348 and Tri-Star Coal Operations LLC is the sole operator of EL 27348 and the Project Area. The work program for EL 27348 during its first year required a geological and geophysical review of existing data and information towards determining the location of Permian coals within the Purni Formation and specifically, their depth, thickness, lateral extent and quality. lt also required mapping activities and the determination of a drilling and/or seismic program moving forward. Tri-Star spent considerable time in investigating and re-analysing the seismic data, water bores and other geological and geophysical data over EL 27348 and the surrounding tenures. The data was highly promising and has therefore caused Tri-Star to revise and improve the original drilling program for the Project Area, to incorporate an ironstone deposit. The ironstone formation, located in between the De Souza and Crown Point Formation, is believed to be temporally contemporaneous with the deeper Permian Purni coals to the east, which are also of great interest to Tri-Star. Officebased studies have determined that it is unlikely that the coal seams extend to the Southern area of EL 27348 and therefore, Tri-Star has voluntarily relinquished approximately 90 per cent (%) of EL 27348. The expenditure commitment for EL 27348 for its first year required an expenditure of 565,000.00. Tri-Star Energy Company has met all work and expenditure commitments for EL 27348 for the term of the licence. The second year of the term will focus on an expanded seismic program over the Project Area and gathering core data through a revised drilling program over the Project area that focuses on both the coal and iron formations to assess their potential mine ability and commerciality.en_US
dc.subject.classificationCoalen_US
dc.titleAnnual report for EL 27348 for the period ending 3 November 2010en_US
dc.relation.isatmap100Umbeara 5646en_US
dc.relation.isatmap100Beddome 5746en_US
dc.relation.isatmap250Finke SG5306en_US
dc.relation.isatgeolprovincePedirka Basinen_US
dc.identifier.tenureEL27348en_US
dc.description.modifyhistory08/12/2010en_US
dc.description.modifyhistory16/11/2018en_US
dc.description.modifyhistory08/01/2019en_US
dc.description.modifyhistory23/01/2019en_US
dc.contributor.holderTri-Star Energy Companyen_US
dc.contributor.holderTri-Star Coal Operationsen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2010en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL27348_2010_A.pdf4.18 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader