Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88078
Export to Endnote
Title: | Bridging report EL 22206 Mount Bundey Project 23 October 2010 to 15 December 2010 |
Title Holder / Company: | Crocodile Gold |
Report id: | CR2010-1138 |
Tenure: | EL22206 |
Year: | 2010 |
Author: | Watson, M |
Abstract: | No exploration activities completed during the reporting period. Interpretation of geophysical data has provided a significant lead for the mineral potential of the project area. Exploration activities for gold and base metals mineralisation will include soil and rock chip sampling and mapping. For uranium mineralisation, identified radiometric anomalies will be examined in the field and ground radiometric survey will be conducted to assess the full potential of these anomalies. Some soil and rock chip samples will be taken for assaying. Encouraging results may lead to a RAB or RC drilling campaign. |
Date Added: | 19-Dec-2018 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL22206_2010_B.pdf | 701.96 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.